Hello all

I just received a xisico compressor from a Canadian supplier. I have a gold filter with molecular sieve that I have never setup. My plan is to get a good water management system setup from the beginning. The setup I envision is based on all I have learn on this forum, it will need to fill a small omega bottle (from 0 psi) and a tiapan these are these following specs I’d like to incorporate into the system:

  1. from the compressor I’d like to add a small tampon type filter to catch oil and water
  2. next a valve followed by a tee with a bleed valve drip leg then to inlet of the filter.
  3. after the gold filter a 2000 pmv or a check valve followed by a gage
  4. after the gage a fill whip to either the tanks or taipan fill probe with the appropriate bleed
  5. I also have a pressure relief valve I plan to incorporate
    [/LIST=1]
    • Regarding w2.&3. I would like to keep the filter under pressure in between fills
    • the inline valve/bleed valve combo would allow controlling the air flow and closing the filter, while the bleed on a drip leg would allow for purging during fill.

    Couple of things:
    1. with this plan in place I am going to need several fittings,valves,pmv etc, is there a one stop company that carries them all?
    2. what a everyone’s thoughts on using hard line wage compression fittings and ss tube for example swagelock?
    3. any opinions on this would really be appreciated.
      [/LIST=1]

      Please pardon me if these questions have been addressed , I have about fifty bookmarks regarding bits and pieces but I am still in need of some guidance/advice.

      As I proceed with this, I would like to contribute all parts,sources and any information to help others. Maybe a dedicated thread on the topic?

      thanks!