Filling new tank

What you need to add is a PMV (pressure maintaining valve). A pressure gauge should be upstream of the PMV so you know what the filter pressure is.
It has a 1/4NPT male on one side and female on the other.

34D26B56-D54A-490E-BBFB-3ABBB96F8726.jpeg
 
  • Like
Reactions: Buckshutr